Due to damage sustained at St Georges Hall, a restoration project taking over a month to complete took place,
reinstating heavy ornamental plasterwork.
Original pieces of mouldings were removed from the site and
taken back to our workshop where new pieces were manufactured to match the existing work. All plaster mouldings
were then installed on site.
The intricate designs of the plaster work and the sheer size of the ceiling
pieces made the final result a dramatic and ornate work of art.
|